-
Tysim high-efficiency small rotary drilling rig supports infrastructure projects ┃ KR90A rotary drilling rig Contributed to the foundation hardening project in Henan and demonstrated outstanding performance
2023-11-14Recently, Tysim KR90A small drilling rig participated in the construction of the pavement foundation hardening (plain pile) project of the 3rd bidding section of Henan Fangtang expressway and achieved excellent on-site performance.
Read Details -
Tyhen Foundation KR240E has performed outstandingly in a housing construction project in Quanzhou, Fujian
2023-11-14Recently, Tyhen Foundation KR240E rotary drilling rig was used in a housing construction project in Quanzhou City, Fujian Province. The geological conditions are mainly silt sand and silty clay layers, high-level groundwater, pile diameter 1000mm, and the single hole depth 35m. Based on the condition, Tyhen's team promptly prepared the appropriate mud ratio for mud wall protection, and cooperated with the operator's reasonable Kelly bar lifting speed control to solve the problem of hole collapse during construction in quicksand strata. In the end, the single hole formation time was shortened to In 1 hour and 45 minutes.The construction task was completed smoothly and efficiently within 20 days, reducing construction costs for customers and winning unanimous praise from customers.
Read Details -
Innovative construction technology │ TYHEN foundation low headroom KR 300ES drilling rig worked for the construction of Guangzhou high-speed railway
2023-10-19Recently, Tyhen Foundation's low headroom KR300ES rotary drilling rig participated in the construction of the Guangzhou-Baiyun District Jingguang High-Speed Rail Line 5 project.
Read Details -
Edge tool of construction for limited space┃Tyhen foundation KR90A performed outstandingly in the factory foundation reinforcement project of Luoyang
2023-10-19Recently, KR90A rotary drilling rig of Tyhen foundation is constructed a factory foundation reinforcement project of Luoyang, Henan Province. It is reported that the geology is backfill of stones and silt, foundation settlement will cause cracks and affect the safety of the surficial construction. The process at the job site involves first grouting to fill cracks and backfill gaps in the strata, followed by the use of bored pile drilling to create a foundation support for the new surface structure, ultimately achieving the goal of ground reinforcement.
Read Details
Follow Us
TYSIM PILING EQUIPMENT
is a professional piling enterprise
focusing on the R&D and manufacturing of small and medium piling machinery
- Office : TYSIM PILING EQUIPMENT Add:No. 345, Yanxin Road, Huishan Economic Development Zone, Wuxi
- Tel: +86 400-019-0510
- Hot Line: +86 19901420655
- E-mail : tysim@tysim.cn