(Summary description)This project is located in Nanjing. The underground pipe gallery project of the power system needs to be constructed under high-voltage lines and has limited high requirements for construction machinery. This is a customized rotary drilling rig. Because customers have relatively high requirements for the working ability of mechanical equipment, in order to cope with complex stratum conditions.

Customized KR150A Rotary Drilling Rig Construction of Nanjing Underground Pipe Gallery

(Summary description)This project is located in Nanjing. The underground pipe gallery project of the power system needs to be constructed under high-voltage lines and has limited high requirements for construction machinery. This is a customized rotary drilling rig. Because customers have relatively high requirements for the working ability of mechanical equipment, in order to cope with complex stratum conditions.

  • Categories:Case
  • Time of issue:2021-08-05 09:40
  • Views:
Information
TYSIM Machinery KR150A rotary drilling rig Nanjing construction video: https://v.qq.com/x/page/g0758z1k71y.html
 
This project is located in Nanjing. The underground pipe gallery project of the power system needs to be constructed under high-voltage lines and has limited high requirements for construction machinery. This is a customized rotary drilling rig. Because customers have relatively high requirements for the working ability of mechanical equipment, in order to cope with complex stratum conditions.

 

A

 

KR150 rotary drilling rig construction
 
The geology of this project is mainly soil layer and weathered rock. The drilling diameter is 800mm, the drilling depth is about 15m, and the hole forming time is about 25 minutes. In the normal construction for 10 hours, 21 holes are formed, and the reinforcement cage must be placed in the middle. The hole-forming efficiency and machine performance have been affirmed by customers.

 

A

 

KR150 rotary drilling rig
 
The standard configuration of the KR150A rotary drilling rig, the drilling diameter is 1500mm, the drilling depth is 52m/42m, and the large output torque is 150kN.m. It is an integral transportation rotary drilling rig suitable for various construction conditions.

 

A

KR150A rotary drilling rig overall transportation

Scan the QR code to read on your phone

Related Products
Ten years of focusing on small and medium-sized piling machinery
CopyRight © 2021 Tysim Piling Equipment Co., Ltd All rights reserved.    苏ICP备13058972号   Powered by:www.300.cn   IPv6 network supported
TOP

TYSIM