(Summary description)Three rotary drilling rigs of TYSIM Machinery participated in this project. The models are 1 KR285C and 1 KR220C. The project is an important land planning node of China's "One Belt One Road" and a leading project for the construction of the CBD financial center.

Uzbekistan Tashkent CBD Bank Headquarters Building Project

(Summary description)Three rotary drilling rigs of TYSIM Machinery participated in this project. The models are 1 KR285C and 1 KR220C. The project is an important land planning node of China's "One Belt One Road" and a leading project for the construction of the CBD financial center.

  • Categories:Case
  • Time of issue:2021-07-29 16:04
  • Views:
Information

Three rotary drilling rigs of TYSIM Machinery participated in this project. The models are 1 KR285C and 1 KR220C. The project is an important land planning node of China's "One Belt One Road" and a leading project for the construction of the CBD financial center.

 

A

 

The project is located in Tashkent New City, with a total construction area of approximately 224,900 square meters, including three super high-rise bank headquarters office buildings. Among them, the Industrial and Construction Bank has 33 floors and a height of 159.2 meters; Asaka Bank has 26 floors and a height of 135 meters; ALOQA Bank has 26 floors and a height of 142.9 meters. The overall construction period of the project is 26 months. After completion, the Industrial Construction Bank Building will be the Uzbek National High Building.

 

A

 

During the construction process, the mud wall protection construction plan was used in the early stage, and our staff found that the construction plan could not realize the construction benefit in this stratum after repeated hole tests on the spot. The project department has repeatedly studied and discussed a variety of feasible options, and finally adopted the water hole operation construction program provided by us in combination with the existing local conditions and successfully completed all the pile foundation projects.

 

A

 

Tashkent is a large city in Central Asia, the capital of Uzbekistan, and one of the important commercial hubs on the ancient "Silk Road". The famous "Silk Road" passes here. The city has a history of 2500 years.

 

A

 

With the maturity of TYSIM Machinery’s medium-sized rotary drilling rigs 220 and 285 equipment to the market, TYSIM has gradually completed the “focus on small and medium-sized rotary drilling rigs, making good products in the industry, and creating internationally renowned pile workers” formulated at the beginning of its establishment. Brand" market positioning. The company will continue to base itself on high-efficiency quality and high-efficiency services, intensively cultivate in product segments, rely on innovation, continuously optimize product performance, and move toward a broad international market and stage, to rectify the name of China's manufacturing and win glory for China's construction machinery industry.

Scan the QR code to read on your phone

Related Products
Ten years of focusing on small and medium-sized piling machinery
CopyRight © 2021 Tysim Piling Equipment Co., Ltd All rights reserved.    苏ICP备13058972号   Powered by:www.300.cn   IPv6 network supported
TOP

TYSIM