NEWS CENTER
TYSIM PILING EQUIPMENT CO., LTD
/
/
Tyhen Foundation participates in the 11th Chinese International Piling and Deep Foundation Summit

Products

Check Category

Contact Details

Tyhen Foundation participates in the 11th Chinese International Piling and Deep Foundation Summit

(Summary description)On 25th to 27th October, the 11th Chinese International Piling and Deep Foundation Summit was held in Shanghai Sheraton hotel of WaiGao bridge. More than 600 pile foundation experts from 10 countries at home and abroad, over 100 companies from domestic pile foundation engineering construction enterprises; machinery & equipment manufacturers, survey and design institutions, Scientific research institutes and other companies attended this Summit.

Tyhen Foundation participates in the 11th Chinese International Piling and Deep Foundation Summit

(Summary description)On 25th to 27th October, the 11th Chinese International Piling and Deep Foundation Summit was held in Shanghai Sheraton hotel of WaiGao bridge. More than 600 pile foundation experts from 10 countries at home and abroad, over 100 companies from domestic pile foundation engineering construction enterprises; machinery & equipment manufacturers, survey and design institutions, Scientific research institutes and other companies attended this Summit.

  • Categories:Company News
  • Time of issue:2021-11-29 13:25
  • Views:
Information

On  25th to 27th October, the 11th Chinese International Piling and Deep Foundation Summit was held in Shanghai Sheraton hotel of WaiGao bridge. More than 600 pile foundation experts from 10 countries at home and abroad, over 100 companies from domestic pile foundation engineering construction enterprises; machinery & equipment manufacturers, survey and design institutions, Scientific research institutes and other companies attended this Summit.The Summit is the largest comprehensive summit in the field of Piling and Deep foundations in Asia. With the theme of "Pile Foundation and Deep Foundation Innovative Technology and Smart Construction", the Summit showcased cutting-edge technologies and solutions to various pile foundation engineering problems at home and abroad, with the aim of promoting the development of pile foundation construction technology. It created the opportunities for the exchange of scientific and technological achievements in Piling and Deep foundation engineering technology; engineering safety and engineering management; and engineering information; building a high-level international academic exchange platform for promoting the continuous improvement of the quality of pile foundation engineering in the world and nurturing a sustainable and harmonious development of the pile foundation industry.Tyhen low headroom KR300ES rotary drilling rig attracted attention in this exhibition. The development of Chinese urbanization has brought about an increase in subway construction when the demand for viaduct in the city rail transit is playing a more and more important role. Most importantly, the need for both environment protection and construction efficiency using rotating drill mechanization construction is also gaining more attention especially in the narrow space construction, and in complex strata conditions. Tyhen low headroom KR300ES rotary drilling rig is able to solve the problems encountered in engineering construction such as small space; large pile diameter; deep depth; large torque rock entries etc. It can also meet the construction requirements of narrow stratum under high pressure voltage line, within tunnel, under a viaduct and entrance of subway station. The maximum drilling depth of KR300ES rotary drilling rig is 31.2 meters, the working height is only 10.9meters, the maximum construction diameter is 2 meters, the power head torque is 320kn.m, the whole machine weight is 76 tons. It can complete large diameter rock entry construction under the condition of low construction height and super deep construction depth. Tyhen KR300ES low headroom full hydraulic rotary drilling rig has been recognized and praised by customers since it was put into the market, and won the trust and support of customers. At present KR300ES low headroom full hydraulic rotary drilling rig has been used in WuHan, HuBei metro Line 11, ShenZhen GuangMing City high-speed rail, ShenZhen TieGang ShiYan reservoir, JiangXi and ShenZhen high-speed railway, ShenZhen GuangMing City station hub, ShenZhen Metro DaYunCheng subway station, Fujian Beijing-Taiwan high-speed railway Quanzhou high-speed railway station, ShenZhen LongGang subway station, GuangDong ShanTou high-speed railway station, LuShan Railway Station in JiangXi province, LiuGong Plant expansion project in LiuZhou, GuangXi Province, Rainwater and sewage Diversion Pipe Gallery project in ShenZhen BaoAn District, NanShan QianLu Hub project of ShenZhen Metro, GuiYang Riverside Theater project and other major projects.During the Summit, through exchanges and sharing, friendships has been enhanced, wisdom has been enlightened, innovation idea has been stimulated to further promote the development of foundation technology in China and to provide a platform for exchange and learning for colleagues in this field, which is of great significance to promote the high-quality development of foundation engineering in the future.

Scan the QR code to read on your phone

Relevant Information
Share the latest developments of the company and industry exhibition information with you.
Related Products
Ten years of focusing on small and medium-sized piling machinery
CopyRight © 2021 Tysim Piling Equipment Co., Ltd All rights reserved.    苏ICP备13058972号   Powered by:www.300.cn   IPv6 network supported
TOP

TYSIM