NEWS CENTER
TYSIM PILING EQUIPMENT CO., LTD
/
/
Tyhen foundation low headroom drilling rig KR300ES assisted Lushan High-speed Railway station expansion project

Products

Check Category

Contact Details

Tyhen foundation low headroom drilling rig KR300ES assisted Lushan High-speed Railway station expansion project

(Summary description)With the rapid economic development, the high-speed railway network has gradually improved on various deficiencies in terms of foundational construction in order to meet the needs of people from different places. In fact, high-speed railway stations have embarked on the road of expansion. While improving on the present deficiencies, the older constructions have been removed and renovated so a new high-speed railway station can continue its original mission.  Recently, Tyhen Foundation’s low headroom drilling rig KR300ES has been invited to participate in the process of expansion for Lushan High Speed Railway Station in Jiujiang, Jiangxi.

Tyhen foundation low headroom drilling rig KR300ES assisted Lushan High-speed Railway station expansion project

(Summary description)With the rapid economic development, the high-speed railway network has gradually improved on various deficiencies in terms of foundational construction in order to meet the needs of people from different places. In fact, high-speed railway stations have embarked on the road of expansion. While improving on the present deficiencies, the older constructions have been removed and renovated so a new high-speed railway station can continue its original mission.  Recently, Tyhen Foundation’s low headroom drilling rig KR300ES has been invited to participate in the process of expansion for Lushan High Speed Railway Station in Jiujiang, Jiangxi.

  • Categories:Company News
  • Time of issue:2022-01-27 11:13
  • Views:
Information

With the rapid economic development, the high-speed railway network has gradually improved on various deficiencies in terms of foundational construction in order to meet the needs of people from different places. In fact, high-speed railway stations have embarked on the road of expansion. While improving on the present deficiencies, the older constructions have been removed and renovated so a new high-speed railway station can continue its original mission.  Recently, Tyhen Foundation’s low headroom drilling rig KR300ES has been invited to participate in the process of expansion for Lushan High Speed Railway Station in Jiujiang, Jiangxi.

On 6 December 1996, Lushan mountain was listed as a World cultural heritage site.  Lushan station is a historical building, it has been around for 100 years ever since its initial construction in 1911. The station is located at ChaiSang Road, ShaHe Street, ChaiSang District, JiuJiang City, Jiangxi Province, serving as a second-class platform under the jurisdiction of China Railway Nanchang Bureau Group, it is the interchange station of the Anzhou-Jiujiang High speed Railway, the Wuzhou-Jiujiang High Speed Railway, the Chang-Jiujiang intercity Railway and the Beijing-Jiujiang Railway.  The fact that it was built in the Qing Dynasty indicates that the location of this high-speed railway station is very ideal. The station's strategic importance is underlined by its nearly 100 years of operation. In order for the Lushan Station to better serve the public, Lushan Station had began its expansion project in 2020.  Currently Lushan Station is under construction. According to the construction plan, thehe station will be expanded to 60,000 square meters, which is nearly 15 times larger than the original station.  

This project is part of the expansion project of Lushan High-speed Railway Station, which is right beside to a high-speed railway station in operation that have many high-speed railways trips every day, so it is a requirement that the construction process of Lushan High-speed Railway Station will not impact the operation of the nearby high-speed railway station. Meanwhile, the height of construction equipment cannot exceed 11 meters, the depth to drill is 28 meters, and the pile diameter to meet is 1 meter.  As the high-speed railway station was built on the mountain, the construction stratum is mainly hard limestone, and the upper layer is red sandstone for about 10 meters. In addition, it is required that the surrounding stratum should not be affected during construction, so that the normal operation of high-speed railway will not be affected. The equipment required needs strong power and rock entering capacity as the construction difficulty is immense. Tyhen’s KR300ES rotary drilling rig has maximum drilling depth of 35 meters, construction height of 10 meters, coupled with the largest construction diameter of 2 meters and power head torque of 320kN.m, perfectly meets the construction requirements such as limited space, the requirement of large pile diameter, deep digging depth, large torque and rock entry capabilities. Furthermore, it is capable of completing the large diameter rock entry construction under the limitation of low construction height and ultra-deep drilling depth requirement.

Tyheng considers “service” as its core value, and utilizes such attitude to provide clients with an “Eight in One” service in terms of selling, leasing, construction, trade-in, re-manufacturing, service, operator supply & training, and consulting & promotion of drilling methods. The company has over 70 small and medium sized piling rigs, and it has formed partnerships with 10 companies which are under APIE. With the maintenance service and delivery service of piling rig provided by dozens pilling manufacturer, TYSIM has established a joint maintenance base that employs a technical and professional maintenance team which has years of experience in machinery servicing to provide clients with professional construction advices and methodologies. After five years of experience, commitment, cooperating with customers and also independent construction works, our small rotary rigs had participated in relatively modern constructions such as dam-reinforcement, underground pipe gallery, and over-water construction, which ultimately contributed towards the domestic promotion of the utilization of small rotary rigs. Tyheng will carefully manage a rental fleet of over hundreds of rotary rigs, and will be committed to develop an industry-leading service platform on a global scale.  

 

Scan the QR code to read on your phone

Relevant Information
Share the latest developments of the company and industry exhibition information with you.
Related Products
Ten years of focusing on small and medium-sized piling machinery
CopyRight © 2021 Tysim Piling Equipment Co., Ltd All rights reserved.    苏ICP备13058972号   Powered by:www.300.cn   IPv6 network supported
TOP

TYSIM