(Summary description)With the recovery of the cultural and tourism industry in Southeast Asia, the expansion project of Sheraton Nai Harn Beach Resort in Phuket, Thailand has officially started. As a key local project, it requires the construction of 3,000 piles with a diameter of 500mm, a pile depth of 8 meters (including 1 meter of hard rock stratum), and a construction period of only 7 months. Facing the dual pressures of "tight construction period + hard geological conditions", the KR90A and KR125A rotary drilling rigs of Jiangsu TYSIM Piling Equipment Co., Ltd. (hereinafter referred to as "TYSIM") have delivered a satisfactory performance.
(Summary description)With the recovery of the cultural and tourism industry in Southeast Asia, the expansion project of Sheraton Nai Harn Beach Resort in Phuket, Thailand has officially started. As a key local project, it requires the construction of 3,000 piles with a diameter of 500mm, a pile depth of 8 meters (including 1 meter of hard rock stratum), and a construction period of only 7 months. Facing the dual pressures of "tight construction period + hard geological conditions", the KR90A and KR125A rotary drilling rigs of Jiangsu TYSIM Piling Equipment Co., Ltd. (hereinafter referred to as "TYSIM") have delivered a satisfactory performance.
With the recovery of the cultural and tourism industry in Southeast Asia, the expansion project of Sheraton Nai Harn Beach Resort in Phuket, Thailand has officially started. As a key local project, it requires the construction of 3,000 piles with a diameter of 500mm, a pile depth of 8 meters (including 1 meter of hard rock stratum), and a construction period of only 7 months. Facing the dual pressures of "tight construction period + hard geological conditions", the KR90A and KR125A rotary drilling rigs of Jiangsu TYSIM Piling Equipment Co., Ltd. (hereinafter referred to as "TYSIM") have delivered a satisfactory performance.


The efficient operation of TYSIM's equipment benefits from in-depth collaboration with local authorized distributors in Thailand. It is understood that prior to the project launch, the two parties jointly conducted geological surveys, optimized the equipment's heat dissipation systems for Thailand's tropical climate, and adapted the equipment to local fuel types. During the construction phase, the distributors established an on-site service team, equipped with original TYSIM spare parts and three senior technicians, achieving a "1-hour response and 4-hour fault resolution" standard.This "Chinese R&D + local service" model is precisely the core logic behind TYSIM's equipment gaining a firm foothold in the Southeast Asian market — its products have been exported in bulk to many countries in the region, and its local service network is becoming increasingly mature.

The Sheraton project is an epitome of TYSIM's deep cultivation in Southeast Asia. As a national high-tech enterprise, TYSIM relying on over 60 core patents, has already deployed various infrastructure projects in Thailand. The cumulative delivery volume of its equipment has been on a steady rise, with applications covering multiple fields such as hotels and highways. Drawing on the experience of this project, TYSIM will join hands with local partners in the future to develop customized equipment more suitable for the geological conditions in Southeast Asia, further expand markets in Vietnam, Malaysia and other countries, and contribute to the upgrading of regional infrastructure.