CASES
TYSIM PILING EQUIPMENT CO., LTD
Contact Us
Please contact us through the following contact information.
Tel: +86 400-019-0510
Phone: +86-18352067788
Fax: +86-510-83590757
E-mail: maofl@tysim.com
Add:No. 345, Yanxin Road, Huishan Economic Development Zone, Wuxi
Good news keeps coming. Three awards welcome the Spring Festival┃TYSIM won the "Outstanding Contribution Award", "Excellent Innovation Award" and "Foreign Trade Advanced Award" in 2023.
Since the inauguration of President Mirziyoyev of Uzbekistan in 2018, there have been significant changes in Uzbekistan's economy and foreign policy. The pace of economic reforms and opening up has accelerated, leading to closer economic and cultural cooperation with China. Chinese enterprises have engaged in extensive collaboration with local government departments and companies in Uzbekistan and Central Asia in the fields of energy and minerals, road transportation, industrial construction, and municipal development.
Recently, Tysim KR90A small drilling rig participated in the construction of the pavement foundation hardening (plain pile) project of the 3rd bidding section of Henan Fangtang expressway and achieved excellent on-site performance.
Recently, Tyhen Foundation KR240E rotary drilling rig was used in a housing construction project in Quanzhou City, Fujian Province. The geological conditions are mainly silt sand and silty clay layers, high-level groundwater, pile diameter 1000mm, and the single hole depth 35m. Based on the condition, Tyhen's team promptly prepared the appropriate mud ratio for mud wall protection, and cooperated with the operator's reasonable Kelly bar lifting speed control to solve the problem of hole collapse during construction in quicksand strata. In the end, the single hole formation time was shortened to In 1 hour and 45 minutes.The construction task was completed smoothly and efficiently within 20 days, reducing construction costs for customers and winning unanimous praise from customers.
Recently, Tyhen Foundation's low headroom KR300ES rotary drilling rig participated in the construction of the Guangzhou-Baiyun District Jingguang High-Speed Rail Line 5 project.
Recently, KR90A rotary drilling rig of Tyhen foundation is constructed a factory foundation reinforcement project of Luoyang, Henan Province. It is reported that the geology is backfill of stones and silt, foundation settlement will cause cracks and affect the safety of the surficial construction. The process at the job site involves first grouting to fill cracks and backfill gaps in the strata, followed by the use of bored pile drilling to create a foundation support for the new surface structure, ultimately achieving the goal of ground reinforcement.