CASES
Tysim Piling Equipment Co., Ltd
/
/
Tysim Machinery assisted the channel renovation project of Shiqiao Shiplock of Beijing-Hangzhou Canal

Products

All categories

Contact Details

Tysim Machinery assisted the channel renovation project of Shiqiao Shiplock of Beijing-Hangzhou Canal

  • Categories:Case
  • Time of issue:2021-07-29 16:12

(Summary description)The waterway improvement project from the Shiqiao ship lock of the Beijing-Hangzhou Canal to the gate of the Yangtze River mouth is a pilot project for the provinces and cities to jointly build a green modern shipping demonstration zone on the Beijing-Hangzhou Grand Canal, and is also a landmark project for high-quality promotion of the construction of the Grand Canal cultural belt.

Tysim Machinery assisted the channel renovation project of Shiqiao Shiplock of Beijing-Hangzhou Canal

(Summary description)The waterway improvement project from the Shiqiao ship lock of the Beijing-Hangzhou Canal to the gate of the Yangtze River mouth is a pilot project for the provinces and cities to jointly build a green modern shipping demonstration zone on the Beijing-Hangzhou Grand Canal, and is also a landmark project for high-quality promotion of the construction of the Grand Canal cultural belt.

  • Categories:Case
  • Time of issue:2021-07-29 16:12
  • Views:
Information

The waterway improvement project from the Shiqiao ship lock of the Beijing-Hangzhou Canal to the gate of the Yangtze River mouth is a pilot project for the provinces and cities to jointly build a green modern shipping demonstration zone on the Beijing-Hangzhou Grand Canal, and is also a landmark project for high-quality promotion of the construction of the Grand Canal cultural belt.

 

A

 

According to the approval of the Provincial Development and Reform Commission, the waterway improvement project from the construction of the bridge of the Beijing-Hangzhou Canal to the gate of the Yangtze River is renovated according to the second-level waterway standard. The design level of large ships is 2000 tons; the width of the channel bottom is not less than 70 meters, and the small navigable water depth is 4.0 meters. The project will renovate the channel length of 5.37 kilometers, rebuild 1 bridge, expand the anchorage at the downstream of Shiqiao ship lock, add berths, increase service functions, and support the construction of ecological greening, shipping and cultural facilities, smart canals, and navigation mark facilities within the scope of the channel. , The project approved budget estimate of 1.33 billion yuan. After purchasing a KR125 rotary drilling rig, the customer of TYSIM signed a contract with TYHEN Foundation, a wholly-owned subsidiary of TYSIM Machinery, after purchasing a KR125 rotary drilling rig. Customers have full trust in TYSIM Machinery; at the same time, TYSIM Machinery also provides good products and services to live up to customer expectations and love.

 

A

 

 

A

 

 

A

 

The smooth implementation of this project will open up the "last one kilometer" navigation bottleneck of the Beijing-Hangzhou Canal and give full play to the benefits of the main waterway. At the same time, it will also play an important role in the construction of a green modern shipping demonstration zone in Yangzhou and the promotion of the construction of the Grand Canal cultural belt. In order to ensure the smooth progress of the project, TYHEN Machinery dispatched full-time after-sales personnel to provide full-time on-site service to escort customers during the construction process, demonstrating the business philosophy and core values of "creating value for customers" that they have consistently adhered to.

Scan the QR code to read on your phone

Related Products
Ten years of focusing on small and medium-sized piling machinery
CopyRight © 2021 Tysim Piling Equipment Co., Ltd All rights reserved.    苏ICP备13058972号   Powered by:www.300.cn   IPv6 network supported
TOP

TYSIM